Reconstruction of Outdoor Switchgeer-35 kV on the substation 330 kV “Sumy”

Our completed reconstruction of Outdoor Switchgeer-35 kV on the substation 330 kV “Sumy” (State Enterprise NPC “UKRENERGO” “Northern Electric Power System“).
According to this project, the reconstruction of Outdoor Switchgeer-35 kV on the substation 330 kV “Sumy” is performed by means of:
• replacement of the voltage transformer 35 kV in cells of power transformers 1AT, 3AT and 4AT for constant-voltage transformers with solid insulation
• installation of clip boxes (Secondary Switching) for this equipment.

Reconstruction of Outdoor Switchgeer-35 kV on the substation 330 kV “Sumy”