Our company completed reconstruction of Outdoor Switchgear 110 kV on substation 110/35/10 kV “Slavuta” with substitution of switchgears 110 kV for gas-insulated switchgears:
• dismantling of existing equipment of Outdoor Switchgear 110 kV;
• construction of foundations and installation of equipment units of 110 kV cells T1, T2, section switchgear-110 kV and 110 kV transmission line “Solodovyi plant” and “Shepetivka 330”;
• installation of direct current cabinet and substitution of the existing auxiliary board of substation;
• installation of new power system protection equipment of power transformers 110/35/10 kV T1 and T2, and the 110 kV transmission line “Solodovyi plant” and “Shepetivka 330”.
• realization of commissioning works.