Podilskiy Energoconsulting

Feasibility study of the transmission line from the substation 750 kV “Vinnytska”

The purpose of the development of the feasibility study is the discharge of existing overhead transmission lines of 110 kV of distribution hoop of Vinnytsia by the construction of a new substation 110 kV “Vuzlova” and semi-chain transmission line 110 kV from the mentioned substation to the substation 750/330/110 kV ”Vinnytska”. This measure is aimed to increase the amount of supply of electricity in order to develop the industrial zone and the attraction of additional investments.

"Feasibility study was developed on a highly professional level with the possibly highest rating of the impact on the networks 110 kV in Vinnytsia and Vinnytsia region". - JSC "Vinnytsyaoblenergo". Feasibility Study was developed in 2011.

 Feasibility study was developed in 2011.

Feasibility study of the transmission line from the substation 750 kV “Vinnytska”

Feasibility study of the construction of transmission line 110 kV from the substation 750 kV "Vinnytska" to the substation 110 kV "Vuzlova"

"Feasibility study was developed on a highly professional level with the possibly highest rating of the impact on the networks 110 kV in Vinnytsia and Vinnytsia region". - JSC "Vinnytsyaoblenergo"