Podilskiy Energoconsulting

Substation “Rodovyshche”

In 2011, by the forces of LLC “Podilskiy Energoconsulting” were completed the installation and commissioning works on the SS 35/6 “Rodovyshche” (new construction). The new substation provides reliable power supply to the Extraction and Processing of Ilmenite Ore Plant in Kirovograd region.

Work carried out in 2011.

Substation “Rodovyshche”

Installation of the equipment and commissioning works on the substation 35/6 "Rodovyshche"

"Installation of the equipment and commissioning was completed in a very short time. It is the work of the specialists of LLC "Podilskiy Energoconsulting" made it possible to provide with power supply our electrical equipment in time." - LLC "Velta"