Podilskiy Energoconsulting

General contract: photovoltaic power plant with nominal power 3,88 MW

As general contractor our company “Podilskiy Energoconsulting” performed construction of second launching complex II-nd part Photovoltaic Power Plant “Hlybochok” with nominal power 3,88 MW on the territory of Hlybochok village council, Trostianets district, Vinnytsia region.
By the specialists of our company was accomplished full range of works – starting from design of Photovoltaic power plant and ending with its commissioning.
Two 10 KV cable lines from 10 KV switchgear of Photovoltaic Power Plant “Rengy Trostianets”, second launching complex II-nd part of construction, to Delivery Station 10 KV of substation 110/35/10 KV “Hlybochok” are laid in order to organize the transfer of generated electricity into the network of PJSC “Vinnytsiaoblenergo”. The length of the track laying is 1.4 km.
Power delivery of II-nd part of second launching complex into PJSC “Vinnytsyaoblenergo” network is done through two cable lines 10 KV, which connect distributor 10 KV of project station to switchgear 10 KV of substation 110/35/10 KV “Hlybochok”.
For the connection of solar panels blocks are used made-in items - Junction Boxes.

General contract: photovoltaic power plant with nominal power 3,88 MW