Podilskiy Energoconsulting

General contract: photovoltaic power plant «Verkhivka-2,8»

In a status of general contractor was fulfilled complete spectrum of works – from design to commissioning of photoelectric solar power plant «Verkhivka-2,8» of LLC “PODILLYA SOLAR PRO” on the territory of Verkhivka village council, Bar district, Vinnytsia region. Characteristics of the object: ...

General contract: photovoltaic power plant «Velyton-2,5»

In a status of general contractor was fulfilled complete spectrum of works – from design to commissioning of photoelectric solar power plant “Velyton-2,5” in urban village Novooleksiivka, Henichesk district Kherson region. Characteristics of the object: Installed capacity – 2500 KW. Number of P...

General contract: photovoltaic power plant «Velygen-6,0»

In a status of general contractor was fulfilled complete spectrum of works – from design to commissioning of photoelectric solar power plant “Velygen-6,0” in urban village Novooleksiivka, Henichesk district Kherson region. Characteristics of the object: Installed capacity – 5700 KW. Number of P...

General contract: photovoltaic power plant with nominal power 3,88 MW

As general contractor our company “Podilskiy Energoconsulting” performed construction of second launching complex II-nd part Photovoltaic Power Plant “Hlybochok” with nominal power 3,88 MW on the territory of Hlybochok village council, Trostianets district, Vinnytsia region.By the specialists of our...

Construction of double-transformer substation 110/10 KV “Prybuzka” of closed type

The construction of double-transformer substation 110/10 KV “Prybuzka” of closed type in Khmelnitsky town is completed. We performed works on installation and commissioning of switchgear 110 KV and switchgear 10 KV and also of power system protection equipment, computer-aided control system of techn...

Construction of substation 35/10 KV “Bilousivka”

Construction of substation 35/10 KV “Bilousivka” for power supply of slaughter department of broiler chickens slaughter complex “Vinnytsia Poultry Farm” LLC in Ladyzhyn town is completed. The switchgear 35 KV was accomplished according to non-typical scheme “One non sectionalized system of bus bars ...

Construction of Photovoltaic power plant LLC “Primewood”

Our company completed the working design, construction and commissioning for creation of photovoltaic power plant “Primewood” of 7 MW power on the territory Sharhorod City Council Sharhorod district Vinnytsia region.Completed works:• connection of 32 912 photovoltaic panels with a unit capacity of 2...

Reconstruction of Outdoor Switchgeer-35 kV on the substation 330 kV “Sumy”

Our completed reconstruction of Outdoor Switchgeer-35 kV on the substation 330 kV “Sumy” (State Enterprise NPC “UKRENERGO” “Northern Electric Power System“).According to this project, the reconstruction of Outdoor Switchgeer-35 kV on the substation 330 kV “Sumy” is performed by means of:• replacemen...

Rreconstruction of 10 kV cable line and fiber optic cable at factory ROSHEN

Our company completed works in the removal of individual sections of the existing 10 kV cable line and existing information cables on the territory of Vinnytsia confectionery factory №2, in connection with the construction of a new building. The need for removal of lines has emerged due to the fact...

Building of biogas construction

We performed detailed design, construction and commissioning works in creation of Complex engineering construction for production of electric power from biogas on the landfill of capacity up to 1 MW and for production of thermal energy of capacity up to 1,2 MW. Complex engineering construction for ...

Reconstruction of substation 110/35/10 kV “Slavuta”

Our company completed reconstruction of Outdoor Switchgear 110 kV on substation 110/35/10 kV “Slavuta” with substitution of switchgears 110 kV for gas-insulated switchgears:• dismantling of existing equipment of Outdoor Switchgear 110 kV;• construction of foundations and installation of equipment un...

Reconstruction of 35/10 kV “Shpykiv” is completed

Reconstruction of substation “Shpykiv” (1st phase) with the replacement of power transformer 35 kV.Completed works:• replacement of the existing power transformer T2 of TM-2500/35-U1 type with a new type of transformer TMN-4000/35-U1;• building of oil receiver T2, oil conductors and oil catcher;• co...

Reconstruction of protectors on 110 kV transmission line “Chernihiv CHP – substation ”Tyagova Chernihiv“

Our company performed installation and commissioning of high-frequency protection posts on 110 kV transmission line “Chernihiv heat electropower station – substation ”Tyagova Chernihiv“ on the substation “Chernihiv heat electropower station” and substation ”Tyagova Chernihiv“.Our company implemented...

Reconstruction of protectors of 110 kV transmission line “Gnatkiv”

Our company completed working design and reconstruction of protectors of 110 kV transmission line “Gnatkiv” on substation 110/35/10 kV “Tomashpil” in order to connect photovoltaic power plant “Rendgy Tomashpil”.Implemented works:• replacement of existing line protection of 110 kV transmission line “...

Modernization of Outdoor switchgear 154 kV of traction substation “Musiivka”

Our company completed the construction and commissioning for modernization of Outdoor switchgear 154 kV of traction substation “Musiivka” Kryvyi Rih railway division of electric power supply, particularly of cells L-945, L-946, L-TMK-1, L-TMK-2, L-137, L-138, OB, ШЗВ, T-1, T-2.Modernization included...

Reconstruction of protectors of 110 kV transmission line “Sumivka”

Выполнен рабочий проект и реконструкция защит ВЛ-110 кВ «Сумовка» на ПС 110/35/10 кВ «Бершадь» в связи с присоединением фотогальванической электростанции ООО «Ренджи Тростянец».Выполненные работы:• замена существующих линейных защит ВЛ-110 кВ «Сумовка» на МП защиту «Диамант» модификации L014 произво...

It is completed the building of a modern semi-transformer substation 110/10 KV

Building of a modern semi-transformer substation 110/10 KV "PFG" is finished with a completion of Outdoor Switchgear-110 KV in accourdance with a scheme 110-2 “two blocks line-transformer with the switches and non-automatic bulkhead from the side of transmission lines” and Outdoor Switchgear-10KV up...

It is completed the building of Photovoltaic Power Plant of LLC “Rendgy Trostianets”.

It is completed the building of Photovoltaic Power Plant on the territory of the village council of Hlybochok, Trostianetskyi district, Vinnytsia region. The first starting complex is with the power of 2,25 MW. Power distribution of the second phase in the PJSC “Vinnytsiaoblenergo” is performed by t...

Completed: the building of the Photovoltaic Power Plant of LLC “Rendgy Bershad”.

The construction of Photovoltaic Power Plant LLC “Rendgy Bershad” on the territory of the village council of Chernyatka, Bershad district, Vinnytsia region of capacity 7.0 MW is completed.Total number of photovoltaic panels of Photovoltaic Power Plant is 31,614 pcs. of unit capacity of 245 watt.Elec...

Building of Photovoltaic Power Plant LLC “Rendgy Tomashpil’”

The building of Photovoltaic Power Plant LLC “Rendgy Tomashpil’”on the territory of the village council of Gnatkiv, Tomashpil’ district, Vinnytsia region of total capacity 4,5 MW is completed.Photovoltaic Power Plant is designed to generate electricity by direct conversion of solar energy into elect...

Reconstruction of the substation 110/35/10 kV “Chernyatka”

It is completed the construction of the substation 110/35/10 kV “Chernyatka” in connection with the joining of Photovoltaic Power Plant LLC “Rendgy Bershad’”. During the reconstruction were performed the following works:       Replacement of existing divide-short-circuit closer 110 kV power unit wi...

Reconstruction of the substation 110/10 kV “Gnatkiv”

It is completed the reconstruction of the substation 110/10 kV “Gnatkiv”   in connection with the joining of Photovoltaic Power Plant LLC “Rendgy Tomashpil’.    During the reconstruction were performed the works of the replacement of existing divide-short-circuit closer 110 kV power unit with LTB D1...

Substation 35/10 kV “Central”

Substitution of transformers on the substation 35/10 kV “Central” with the reconstruction of the foundation, oil channels and oil catcher....

Substation 110/35/10 kV “Signal”

Substitution of transformers on the substation 110/35/10 kV “Signal” with the reconstruction of the foundation, oil channels and oil catcher....

Substation 110/35/10 kV “Zhmerynka”

Substitution of transformers on the substation 110/35/10 kV “Zhmerynka” with the reconstruction of the foundation, oil channels and oil catcher....

Substation “Rozsoshentsi”

Reconstruction of the substation 110/10 kV “Rozsoshentsi” in the village of Rozsoshentsi, Poltava district, Poltava region. Replacement of the power transformers. JSC “Poltavaoblenergo”....

Substation 110/35/10 kV “Mashivka”

The reconstruction of the substation 110/35/10 kV “Mashivka” of the JSC “Poltavaoblenergo”: replacement of the power transformer 1T of the capacity 10 MVA with the new one....

Transmission line 35 kV Mashivka

Reconstruction of 110 kV transmission line of PJSC "Poltavaoblenergo" on the object "Implementation of high-speed passenger trains on the section Grebinka - Poltava - Krasnohrad - Kharkiv - Lozova": 35 kV Mashivka - N.Hryhoriyivka....

Transmission line 110 kV Karlivka - Krasnohrad

Reconstruction of 110 kV transmission line of PJSC "Poltavaoblenergo" on the object "Implementation of high-speed passenger trains on the section Grebinka - Poltava - Krasnohrad - Kharkiv - Lozova": 110 kV Karlivka – Krasnohrad in runs №11-12....

Autotransformer AT-2

Modernization project for the replacement of the autotransformer AT-2, South-West ES....

Substation 330 kV “Khmelnytska”

Reconstruction of the substation 330 kV “Khmelnytska”....

Transmission line 110 kV “Vinnytska”

Building project of the transmission line 110 kV from the substation 750 kV “Vinnytska” to the substation 110 kV “Eastern”, two-stage design: project (P) and working documents (W)....

LLC "Rendgy Trostianets"

Construction of Photovoltaic Power Plant of LLC "Rendgy Trostianets", Trostyanetsky district, Vinnytsia region....

Substation 110/35/10 kV “Glybochok”

It is implemented construction, installation and commissioning (reconstruction) of the Substation 110/35/10 kV “Glybochok”, in connection with the joining of the Photovoltaic Power Plant of LLC “Rendgy Trostyanets”....

LLC “Green Agro Service”

LLC “Podilskiy Energoconsulting” has carried out construction project of the Photovoltaic Power Plant with the capacity of 4,5 MW near the village of Porogy, Yampil district, Vinnytsia region and project and working documents of the reconstruction of the substation 110/35/10 kV “Porogy” with the con...

Substation “Signal”

LLC “Podilskiy Energoconsulting” has performed reconstruction project of the substation 110/35/10 kV "Signal". There were developed design solutions of the replacement of the power transformer T-1 type TDTNH-15000/110 with a new type TDTN  16000/110 and high voltage equipment cell 110 kV and 35 kV T...

Substation “ Zhmerynka”

LLC “ Podilskiy Energoconsulting” has performed reconstruction project of the substation 110/35/10 kV "Zhmerynka". There were developed design solutions of the replacement of the power transformer T-1 type TDTNH-16000/110 with a new type TDTN  16000/110 and high voltage equipment cell 110 kV and 35 ...

LLC "Piskivskyy Glassware Factory"

LLC “Podilskiy Energoconsulting” performed the construction project of 110/10 kV "Piskivskyy Glassware Factory". The project includes: construction of semi-transformer substation 110 /10 kV with the performance of Indoor Switchgear-110 kV according to the scheme 110-2 "two blocks from transformer - ...

Vinnytsia 750

LLC “Podilskiy Energoconsulting” performed dismantling and construction works in the cell of the shunt reactor of the transmission line 750 kV "Western Ukrainian" with the delivery of the equipment, materials and components....

Switchgear of shunt reactor

LLC “Podilskiy Energoconsulting” fulfilled the development of the working project of automation panels on the basis of MP terminal RET670 to the new LTB D1/B SF 6 circuit breaker of the shunt reactor of the transmission line 750 kV South-Ukrainian Nuclear Power Plant and to the existing Power System...

Substation “Khmelnytska”

LLC “Podilskiy Energoconsulting” performed reconstruction project (modernization) of the substation 330/110/10 kV “Khmelnytska” with the replacement of the power autotransformer AT-2 with the arrangement of a new lead receiver, valve switches 110 and 10 kV of the autotransformer with the new non-lin...

Substation 330/110/35 kV “Bar”

In 2011 LLC “Podilskiy Energoconsulting” performed installation and commissioning works on the building of the cell 110 kV on the substation 330/110/35 kV "Bar" for the provision of the external power supply of the stationary traction substation on the station Komarivci of the South Western Railway ...

Project “Bershad Milk”

By the forces of “Podilskiy Energoconsulting” has been done the design (PW phase) reconstruction and commissioning of the existing Indoor Switchgear 35 kV and Outdoor Switchgear  10 kV of the substation 35/10 kV "MKK" and adjusting the existing commercial accounting scheme with the Rules for Electri...

Feasibility study of the transmission line from the substation 750 kV “Vinnytska”

The purpose of the development of the feasibility study is the discharge of existing overhead transmission lines of 110 kV of distribution hoop of Vinnytsia by the construction of a new substation 110 kV “Vuzlova” and semi-chain transmission line 110 kV from the mentioned substation to the substatio...

Substation “Rodovyshche”

In 2011, by the forces of LLC “Podilskiy Energoconsulting” were completed the installation and commissioning works on the SS 35/6 “Rodovyshche” (new construction). The new substation provides reliable power supply to the Extraction and Processing of Ilmenite Ore Plant in Kirovograd region....

Project "Roshen"

Construction of the new substation 110/10 kV "VKF" with 2x25 MVA transformers, with Indoor Switchgear-circuit 110 kV of 110-2 type and Outdoor Switchgear-circuit 10 kV of 10-1 type. Detailed design, construction, installation and commissioning.    ...